| 1. | Quick construction of intersection with large span 大跨度交岔点快速施工技术 |
| 2. | The design of top - structure about large span factory building 大跨度单层工业厂房上部结构的设计 |
| 3. | Experiment study on the large span new type truss string structure 大跨度新型张弦桁架的实验研究 |
| 4. | Construction of ultra - large span prestressed string truss structure 超大跨度预应力张弦桁架结构施工 |
| 5. | Design optimization and application of large span cable crane 大跨度缆索起重机的设计优化与施工应用 |
| 6. | Quality control of construction of large span pre - stressed folded plate 大跨度预应力折板施工质量控制措施 |
| 7. | Bolting with mesh in large span open - off cut in fully mechanized top - caving face 大跨度综放面开切眼锚网支护 |
| 8. | An experimental investigation for the wind pressure distribution on a large span awning 大跨雨棚风洞测压试验研究 |
| 9. | The bridge construction technology of large span box frame in lanyan double - line 蓝烟复线大跨度箱形框构中桥施工技术 |
| 10. | Design of tunnel portal section with large span in complicated terrain and geology area 地质情况下大跨度隧道洞口段设计 |